Extron electronic Projector Accessories PMK 560 User Manual

PMK 560 • Installation Guide  
The Extron PMK 560 Pole Mount Kit, designed for use with the Extron PoleVaultSystem, allows  
for easy mounting of PoleVault products to a projector pole. It is used to mount the PoleVault system switcher the associated  
power supply and an accessory device within an enclosure and below a suspended ceiling.  
CAUTION: Maximum load for the PMK 560 is 15 lbs (6.8 kg).  
Mounting Plate  
Base Plate  
Items included in the kit are:  
Covers (2), Base plate (1), Mounting plate (1),  
Tie wraps and pads (to secure power supply)  
4-40 Screws (to mount devices) (3),Cover Screws (4)  
NOTE: For full device installation, configuration,  
menus, connector wiring, and operation details of  
the PoleVault switcher, see the PoleVault System  
Installation Guide, available at www.extron.com.  
To open, remove 4 cover screws  
and slide the covers away.  
PMK Covers (2)  
Figure 1. PMK 560  
Installation  
To install the PMK 560 in a PoleVault system:  
1. Remove the four cover screws from the center of the PMK 560  
(see figure 1). Slide the two halves apart and remove them from  
the base plate.  
3
NOTE: If the PoleVault switcher and its power supply  
4
Attach  
Power  
Supply  
are already installed, go directly to step 4.  
Attach PMK to the projector  
pole pipe collar with the four  
10-32 set screws.  
2. To mount the PoleVault switcher, place the mounting plate, with  
the raised tabs upwards, on the top surface of the switcher and  
pass the two supplied 4-40 x 3/16 inch screws into the top of the  
switcher (see figure 2, b). Secure the mounting plate but do not  
overtighten.  
5
Hook the combined mounting  
plate and switcher into the  
base plate and secure with  
screws.  
3. Attach the associated power supply to the base plate with the  
supplied tie wraps and pads, by passing them through the  
appropriate slots and around the power supply (see figure 2 c).  
Tighten until snug.  
Projector  
Pole  
2
Attach Mounting plate  
to the top of the  
PoleVault switcher.  
4. Loosen the four pipe collar set screws (see figure 2 d), and slide  
the base plate up the pipe until it is touching the suspended ceiling.  
5. Level the base plate and secure it by fully tightening the set screws.  
INPUT  
P
O
W
1
E
S
2
R
V
3
A
M
A
X
1/  
2
SI  
G
OUTP  
UT  
IN  
K
3/  
4
SI  
AUDIO  
L
G
L
IN  
OU  
R
K
T
HDM  
PVT  
P
I
A
G
IN  
SEN IN  
G
S
O
R
P
V
S
4
0
5
PVT  
IN  
INP  
L
SA IP  
UT  
5
R
+V  
VOI  
AU  
X
CELIF  
NOTE: At least three set screws must come in contact  
T
AMPL  
IFIE  
D
O
GRO  
N
U
D
AUD  
L
O
ND  
OR  
SP  
T
SHOR  
EAK  
T
with the pipe.  
IO OU  
O
T
U
OVER  
E
T
PVS 405D  
Switcher  
P
R
S
4
/8  
T
R
U
Ω
PV  
IR  
T
REMO  
RS-2 TE  
32  
LAN  
S
G
1
Tx  
Rx  
G
LAN  
2
LAN  
3
6. Hook the combined plate and switcher into the PMK 560 base plate  
(see figure 2, e). Secure it to the base plate with two screws.  
ATTENTION:  
Use only supplied screws to avoid  
Figure 2. Attach the mounting plate to the switcher  
damaging the switcher.  
and secure both to the base plate.  
 

Dynex TV Converter Box DX SF110 User Manual
Eclipse Fujitsu Ten GPS Receiver AVN 20D User Manual
Electro Voice Musical Instrument Amplifier EVF 1121S FG User Manual
Fisher Price Automobile F 150 User Manual
Fisher Price Baby Toy 72818 User Manual
Ford Automobile Parts M 6007 F50 User Manual
Fostex Power Supply X 34 User Manual
Fujitsu Air Conditioner AOU09RL2 User Manual
Fundex Games Board Games Sybarit User Manual
Giant Water Pump P46HT User Manual