I N S T A L L A T I O N I N S T R U C T I O N S
Multiple Projector Stacking System - Ceiling Mount
LCD2C
Installation Instructions
LCD2C
LEGEND
Tighten Fastener
Pencil Mark
Apretar elemento de fijación
Befestigungsteil festziehen
Apertar fixador
Marcar con lápiz
Stiftmarkierung
Marcar com lápis
Segno a matita
Potloodmerkteken
Marquage au crayon
Serrare il fissaggio
Bevestiging vastdraaien
Serrez les fixations
Loosen Fastener
Drill Hole
Aflojar elemento de fijación
Befestigungsteil lösen
Desapertar fixador
Perforar
Bohrloch
Fazer furo
Praticare un foro
Gat boren
Allentare il fissaggio
Bevestiging losdraaien
Desserrez les fixations
Percez un trou
Phillips Screwdriver
Adjust
Destornillador Phillips
Ajustar
Kreuzschlitzschraubendreher
Chave de fendas Phillips
Cacciavite a stella
Einstellen
Ajustar
Regolare
Afstellen
Ajuster
Kruiskopschroevendraaier
Tournevis à pointe cruciforme
Open-Ended Wrench
Llave de boca
Remove
Quitar
Gabelschlüssel
Chave de bocas
Chiave a punte aperte
Steeksleutel
Entfernen
Remover
Rimuovere
Verwijderen
Retirez
Clé à fourche
By Hand
Optional
Opcional
Optional
Opcional
Opzionale
Optie
A mano
Von Hand
Com a mão
A mano
Met de hand
À la main
En option
Hex-Head Wrench
Security Wrench
Llave de cabeza hexagonal
Sechskantschlüssel
Chave de cabeça sextavada
Chiave esagonale
Llave de seguridad
Sicherheitsschlüssel
Chave de segurança
Chiave di sicurezza
Veiligheidssleutel
Clé de sécurité
Zeskantsleutel
Clé à tête hexagonale
3
LCD2C
Installation Instructions
TOOLS REQUIRED FOR INSTALLATION
7/32" (5.5mm)
1/2" (12.7mm)
#2
PARTS
A (2)
B (1)
D (4)
F (1)
C (1)
E (1)
G (8)
I (5)
K (8)
H (8)
1/4-20X1-1/2"
L (8)
1/4-20X1-1/2"
J (16)
M (8)
5/16-18X3/8"
1/4-20X1-1/4"
4
Installation Instructions
LCD2C
Assembly And Installation
For RPA Models Only
WARNING: Failure to provide adequate structural strength
for this component can result in serious personal injury or
damage to equipment! It is the installer’s responsibility to
make sure the structure to which this component is attached
can support five times the combined weight of all equipment.
Reinforce the structure as required before installing the
component.
6
(G) x 4
(J) x 4
RPA
7
(I) x 2
1. Mark the six mounting hole locations through the ceiling
plate. (See Figure 1)
2. Drill six 7/32" holes.
A
3. Use six fasteners (not provided) to mount the ceiling plate
to the appropriate structural ceiling. The 1-1/2" NPT pipe
must be pointing down. (See Figure 1)
8
E
(H) x 4
X6
1
X6
2
Figure 2
7. Slide both projector arms (A) onto the 1-1/2" vertical pipe
section and secure using two 5/16-18 x 3/8" set screws (I)
on each arm.
8. Thread 1-1/2" safety nut (E) onto threaded end of the 1-1/2"
pipe section.
9. Mount projector hanging bracket to your projector (see RPA
instructions).
10. Partially thread 10-24 thumbscrews onto 10-24 studs at top
of hanger bracket plate. The quantity of thumbscrews may
vary from three to six.
3
X6
11. Align studs with key slots of RPA, slide RPA into place, and
secure RPA by tightening thumbscrews.
Figure 1
12. Adjust projector for correct registration.
4. Thread the 1-1/2" NPT pipe (C) into the ceiling plate and
tighten securely.
For RPM Models Only
1. Proceed with Steps 1-5 under For RPA Models Only.
5. Secure NPT pipe to ceiling plate using one 5/16-18x3/8" set
screw (I).
2. Place RPM on its top so that four screw holes are visible
through the square in the RPM base. (See Figure 3)
6. Attach RPA to projector arm (A) using four 1/4-20 X 1-1/2"
carriage bolts (H), four 1/4-20 acorn nuts (G) and 1/4" flat
washers (J). (See Figure 2)
3. Insert four 1/4"-20x1-1/2" (L) button head cap screws into
the bottom of the RPM. (See Figure 3)
NOTE: The RPM base is not shown in Figure 3 for clarity only.
It should NOT be removed for this installation process.
5
LCD2C
Installation Instructions
Interface
Brackets (D)
4 screw
holes
1
RPM
(M)x4
RPM base
not shown for
clarity only.
(L)x4
Figure 3
4. Place four nylon spacers (M) onto the screws as shown in
Figure 3.
5. Tighten the screws through the nylon spacers and into the
two interface brackets (D). (See Figure 3)
6. Insert four 1/4"-20x1-1/4" (K) button head cap screws from
the top of the projector arm. (See Figure 4)
A
K x 4
J x 4
RPM not shown
for clarity only
D
Figure 4
7. Place a 1/4" flat washer (J) onto each screw.
8. Hold the RPM (with interface brackets attached) to the
bottom of the projector arm and tighten the screws through
the washers and into the interface brackets.
9. Proceed with Steps 7 - 12 from For RPA Models Only
section.
6
Installation Instructions
LCD2C
7
LCD2C
Installation Instructions
USA/International
Europe
A
P
F
A
P
F
8401 Eagle Creek Parkway, Savage, MN 55378
800.582.6480 / 952.894.6280
877.894.6918 / 952.894.6918
Fellenoord 130 5611 ZB EINDHOVEN, The Netherlands
+31 (0)40 2668620
+31 (0)40 2668615
Asia Pacific
A
Room 30I, Block D, Lily YinDu International Building
LuoGang, BuJi Town, Shenzhen, CHINA. Post Code: 518112
8804-000052 RevB
¤2006 Chief Manufacturing
11/06
P
F
+86-755-8996 9226 ; 8996 9236 ; 8996 9220
+86-755-8996 9217
|